Shire: River bank stabilisation – River Derwent

 In Case Studies

Shire Consulting was appointed to carry out emergency stabilisation and reconstruction works along the river Derwent following a significant embankment failure caused by a fallen tree during high winds.

Download the full PDF here.

Recent Posts
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt
0

Start typing and press Enter to search